Well done!
All criteria passed
Boost elegantthemes.com's SEO with Kontactr's Guest Posting.
Secure high-authority, do-follow backlinks from our trusted site—DA44 domain authority and PA55 homepage and blog pages.
Perfect for webmasters seeking higher search rankings and increased organic traffic.
Simple, quick, and effective.
opens a new window
The Most Popular WordPress Themes In The World
https://elegantthemes.com
WordPress Themes with Visual Drag & Drop Technology that empower a community of 601,772 customers. Home of Divi, the ultimate Visual Page Builder and Theme.
https://elegantthemes.com
The Most Popular WordPress Themes In The World
WordPress Themes with Visual Drag & Drop Technology that empower a community of 601,772 customers. Home of Divi, the ultimate...
Great, a redirect is in place to redirect traffic from your non-preferred domain. All versions of your page point to the same URL.
| Attribute | Value |
| ⓘ robots | noodp |
| ⓘ viewport | width=device-width, initial-scale=1 |
ⓘ The results of our semantic analysis are shown below using the website's language.
They are the main concepts covered by elegantthemes.com.
Each concept has a confidence score. The higher it is, the more important the topic is relative to the page.
| Topics | |
WordPress Confidence: 82%
|
|
Technology Confidence: 68%
|
|
Community Confidence: 65%
|
✅ elegantthemes.com website speed is fast. Page speed is important for visitors and search engines.
Get insights to improve your page loading time.
This domain loads at the median speed of 1.5 seconds.
elegantthemes.com is faster than approximately 58 percent of the web. Your website page speed needs to be as fast as you can make it, without compromising the customer experience.
A good goal to achieve is a loading time of 2 seconds on desktop and mobile devices.
ⓘ This website is ranked #5.860 by Alexa.
This rank is traffic based. The lower the rank is, the better the domain is ranked.
| Country | Rank |
Viet Nam |
#5.382 |
India |
#1.663 |
Indonesia |
#4.590 |
Egypt |
#4.194 |
Bangladesh |
#1.628 |
Turkey |
#4.197 |
Spain |
#2.835 |
Pakistan |
#1.773 |
United States of America |
#3.577 |
Iran (Islamic Republic of) |
#4.844 |
Australia |
#2.455 |
Saudi Arabia |
#6.107 |
Chile |
#1.594 |
Switzerland |
#1.219 |
Nigeria |
#2.479 |
Argentina |
#3.792 |
France |
#6.136 |
Colombia |
#5.428 |
Brazil |
#4.049 |
Greece |
#4.824 |
Mobile Rendering
This website seems to be optimized for Mobile Visitors.
Phone
Tablet
A good text to HTML ratio is anywhere from 25 to 70%.
This percentage refers to the visible text ratio, as opposed to HTML elements, image tags and other non-visible information.
Great, we found headings on this page.
| Top level heading |
| Wordpress unleashed |
For a better readability, only the first 20 <H2> tags are shown below.
| 2nd level heading |
| The most popular wordpress themes ın the world and the ultimate visual page builder |
| Divi |
| The most popular wordpress theme ın the world and the ultimate wordpress page builder |
| Build |
| Build pages visuallyon the front end of your website |
| Design |
| The most powerful design tool for wordpress |
| Customize |
| Customize every part of your website. control the finest details. |
| Divi is for everyone |
| Promote |
| Split testing, lead generation, and social media ıntegration |
| Sell! |
| Sell products online with tailored woocommerce ıntegration |
| Showcase |
| Display your work to the world |
| Engage |
| Tell powerful stories and create mesmerizing blog posts with unique content design elements |
| Power |
| Power your entire team with a single membership |
For a better readability, only the first 20 <H3> tags are shown below.
| 3rd level heading |
| About divi |
| Live builder demo |
| Layouts library |
| Plans & pricing |
| Documentation (2) |
| Divi facebook group |
| Divi meetups |
| Customer showcase |
| Divi all in one theme |
| Extra magazine theme |
| Divi builder plugin |
| Bloom email optin plugin |
| Monarch social media plugin |
| Get ın touch |
| Sales questions? |
| Accounts & billing |
| Technical support |
| Ask the community |
| Account details |
| My downloads |
| 6th level heading |
| Divi changes everything. give ıt a test drive! |
We found 31 images on this website.
Great,
0
ALT attributes are missing on your image tags.
For a better readability, only the first 50 internal links are shown below.
| ⓘ Domain Registrar | GODADDY.COM, LLC |
| ⓘ Registration Date | 10/07/2008 17 years, 4 months ago |
| ⓘ Last Modified | 11/03/2018 7 years, 3 months, 4 days ago |
| ⓘ Expiration Date | 10/07/2026 8 months, 4 days from now |
| Host | IP Address | Country |
| andy.ns.cloudflare.com | 173.245.59.101 | United States |
| lucy.ns.cloudflare.com | 173.245.58.133 | United States |
| Domain |
India (20.0%)
Spain (3.3%)
United States of America (21.6%)
Brazil (4.3%)
ⓘ Responsive website, mobile-friendly.
SOCIAL MEDIA PRESENCE
Congratulations, your website is highly shared on social media! It's an excellent signal for your overall SEO strategy.