mobile
Mobile menu

Whois & Analysis for ganttpro.com

Jan 15, 2020 1:38 am UTC

DOMAIN OWNER WHOIS

The owner has chosen to keep his whois contact information private.
• Contact Name
Registration Private
• Organization
Domains By Proxy, LLC
• Address
DomainsByProxy.com, 14455 N. Hayden Road
• City
Scottsdale
• Zip Code
85260
• State
Arizona
• Country Code
US
• Phone Number
• Domain Registrar
Desktop screen Desktop screenshot for ganttpro.com
76

8 criteria passed
3 criteria to solve

PERFORMANCE OPPORTUNITIES

Set a meta content-type (or meta charset) for your website.
Arrow
Make all versions of your website point to the same URL.
Arrow

OVERVIEW

• Domain Owner
Private
• Category
Technology & Computing  >  Graphics Software
• Online since
January 10, 2015 Explore Wayback Machine
• Age
11 years, 23 days
• Alexa Rank
#81.920, ganttpro.com is in the world's top 100.000 websites!

GUEST POST TO SUPERCHARGE YOUR SEO

Guest Posting Rocket

Boost ganttpro.com's SEO with Kontactr's Guest Posting.

Secure high-authority, do-follow backlinks from our trusted site—DA44 domain authority and PA55 homepage and blog pages.

Perfect for webmasters seeking higher search rankings and increased organic traffic.

Simple, quick, and effective.


opens a new window

TECHNICAL SEO & SECURITY

SSL Certificate
This website is not SSL secured (HTTPS), the certificate issued by Let's Encrypt has expired on March 16, 2020.
Title Tag
Online Gantt Chart Software for Project Planning | GanttPRO
Length: 59 (recommended: 10 to 70)
Meta Description
Sign up for free and create Gantt charts in GanttPRO online Gantt chart software. Plan, create, and manage tasks and schedules in minutes. Quick registration.
Length: 158 (recommended: 50 to 160)
Google preview
Desktop Version

Online Gantt Chart Software for Project Planning | GanttPRO

https://ganttpro.com

Sign up for free and create Gantt charts in GanttPRO online Gantt chart software. Plan, create, and manage tasks and schedules in minutes. Quick registration.

Mobile Version

https://ganttpro.com

Online Gantt Chart Software for Project Planning | GanttPRO

Sign up for free and create Gantt charts in GanttPRO online Gantt chart software. Plan, create, and manage tasks and schedules in...

Encoding
No language/character encoding is specified
URL Resolve

No 301 redirects are in place to redirect traffic to your preferred domain. Pages that load successfully both with and without www. are treated as duplicate content! Not all versions of your page point to the same URL.

URL Parameters
Great, the domain URLs look clean.
Attribute Value
content-type text/html; charset=UTF-8
viewport width=device-width,height=device-height,initial-scale=1,maximum-scale=1,user-scalable=no,viewport-fit=cover

SEMANTIC ANALYSIS

The owner has associated the following topics to the website.

The results of our semantic analysis are shown below using the website's language.

They are the main concepts covered by ganttpro.com.

Each concept has a confidence score. The higher it is, the more important the topic is relative to the page.

Topics
Gantt chart Confidence: 92% Arrow up

A Gantt chart is a type of bar chart, devised by Henry Gantt in the 1910s, that illustrates a project schedule.

Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project.

Terminal elements and summary elements comprise the work breakdown structure of the project.

Modern Gantt charts also show the dependency (i.e., precedence network) relationships between activities.

Gantt charts can be used to show current schedule status using percent-complete shadings and a vertical "TODAY" line as shown here.

Project planning Confidence: 74% Arrow up

Project planning is part of project management, which relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment.

Software Confidence: 69% Arrow up

Computer software, or simply software, is that part of a computer system that consists of data or computer instructions, in contrast to the physical hardware from which the system is built.

In computer science and software engineering, computer software is all information processed by computer systems, programs and data.

Computer software includes computer programs, libraries and related non-executable data, such as online documentation or digital media.

Computer hardware and software require each other and neither can be realistically used on its own.

Task (project management) Confidence: 65% Arrow
Schedule (project management) Confidence: 65% Arrow

WEBSITE SPEED

ganttpro.com website speed is normal. Page speed is important for visitors and search engines.

Get insights to improve your page loading time.

Page Loading Time

3.1s

This domain loads at the median speed of 3.1 seconds.

Speed Percentile

21%

ganttpro.com is faster than approximately 21 percent of the web. Your website page speed needs to be as fast as you can make it, without compromising the customer experience.

A good goal to achieve is a loading time of 2 seconds on desktop and mobile devices.

PAGESPEED INSIGHTS

Page on which speed is tested live:

Chrome User Experience Report Results

Lighthouse Results

TRAFFIC

This website is ranked #81.920 by Alexa.

This rank is traffic based. The lower the rank is, the better the domain is ranked.

Daily visitors by country

  • ganttpro.com daily visitors distribution - Total: 8 countries
  • Flag for IndiaIndia (33.8%)
  • Flag for Russian FederationRussian Federation (4.1%)
  • Flag for PakistanPakistan (3.5%)
  • Flag for United States of AmericaUnited States of America (11.1%)
  • Flag for United Arab EmiratesUnited Arab Emirates (4.6%)
  • Flaf icon for other countryOthers (42.9%)

Traffic country ranks

Country Rank
Flag for IndiaIndia #30.385
Flag for Russian FederationRussian Federation #71.256
Flag for PakistanPakistan #34.759
Flag for United States of AmericaUnited States of America #128.821
Flag for Iran (Islamic Republic of)Iran (Islamic Republic of) #60.447

LAYOUT

Doctype HTML5 Arrow Responsive website, mobile-friendly. Arrow

Mobile Rendering

This website seems to be optimized for Mobile Visitors.

Phone
How ganttpro.com looks like on a mobile device such as an iPhone.

Tablet
How ganttpro.com looks like on a tablet such as an iPad.

Main colors used

These are the main HTML color codes used by this website. Arrow
  • 93% #207060
  • 2% #408080
  • 1% #509080
  • 1% #ffa000
  • 1% #60a090
  • 1% #f0a010
  • 0% #b09030
  • 0% #708040
  • 0% #ffa010
  • 0% #80b0b0
  • 0% #a0d0d0
  • 0% #ffb030

Text/code ratio

ganttpro.com's text/code ratio is 2.93%. It's a bit low. Consider raising it by adding more text content of value for your visitors, or keeping your code clean.
Text / Code Ratio 2.93%

A good text to HTML ratio is anywhere from 25 to 70%.

This percentage refers to the visible text ratio, as opposed to HTML elements, image tags and other non-visible information.

Main HTML tags

Headings Arrow up

Great, we found headings on this page.

  • <H1> 1
  • <H2> 9
  • <H3> 10
  • <H4> 0
  • <H5> 0
  • <H6> 0
<H1>
Top level heading
Online project management solution based on gantt charts
<H2>
2nd level heading
Achieve your best results in project management! try ganttpro for free online to see the difference:
We are happy to deliver the best value to people who choose us .
Plan your project and manage tasks with the help of the online gantt chart
As many different project plans online as you need, structured
Automatic online project scheduling and drag and drop simplicity
<H3>
3rd level heading
Make gantt charts with workload
Gantt chart maker (3)
Online gantt chart maker free
Gantt chart software with notifications
Gantt chart auto scheduling
Alt attributes Arrow up

We found 64 images on this website.
33 ALT attributes are missing on your image tags. The issue affects 17 actual different images that could be loaded more than once in your page.

Alternative text allows you to add a description to an image.

Google rely on alternative text attributes to determine relevance to a search query. Alternative text also makes an image more likely to appear in a Google image search.

It looks like you're missing alternative text for 33 images on ganttpro.com. Check your website to make sure it's specified for each image on the page.

SOCIAL MEDIA PRESENCE

This is an overview of your homepage shares on social networks.

You have a relatively high presence on social media, keep going!

The more people share your website, the more likely you will get links from others, which is a key point when it comes to improving your overall search engine rankings.

  • Facebook iconFacebook
  • Total Engagement 2.419
  • Likes 194
  • Shares 2.049
  • Comments 176

DOMAIN REGISTRAR

Domain Registrar GODADDY.COM, LLC
Registration Date 01/10/2015 11 years, 23 days ago
Last Modified 01/08/2020 6 years, 25 days ago
Expiration Date 01/10/2022 Expired
Nameservers Arrow up
Host IP Address Country
daisy.ns.cloudflare.com 173.245.58.90 Flag for United StatesUnited States
trey.ns.cloudflare.com 173.245.59.242 Flag for United StatesUnited States

SERVER DETAILS

Server map
  • Service Provider (ISP)
  • Microsoft Corporation
  • IP Address
  • 13.94.137.87
  • Country
  • Flag for NetherlandsNetherlands
  • Region
  • North Holland , Amsterdam
  • Latitude and Longitude
  • 52.3667 : 4.9
SHARE THIS PAGE