mobile
Mobile menu

Whois & Analysis for instagantt.com

Dec 18, 2019 11:15 am UTC

DOMAIN OWNER WHOIS

The owner has chosen to keep his whois contact information private.
• Contact Name
WhoisGuard Protected
• Organization
WhoisGuard, Inc.
• Address
P.O. Box 0823-03411
• City
Panama
• State
Panama
• Country Code
PA
• Phone Number
• Domain Registrar
Desktop screen Desktop screenshot for instagantt.com
79

9 criteria passed
2 criteria to solve

PERFORMANCE OPPORTUNITIES

Make your meta description eloquent and appealing, neither too short nor too long.
Arrow
Fill the missing alt attributes on your images.
Arrow

OVERVIEW

• Domain Owner
Private
• Category
Society  >  Social Networking
• Online since
April 28, 2013 Explore Wayback Machine
• Age
12 years, 9 months, 11 days
• Alexa Rank
#85.643, instagantt.com is in the world's top 100.000 websites!

GUEST POST TO SUPERCHARGE YOUR SEO

Guest Posting Rocket

Boost instagantt.com's SEO with Kontactr's Guest Posting.

Secure high-authority, do-follow backlinks from our trusted site—DA44 domain authority and PA55 homepage and blog pages.

Perfect for webmasters seeking higher search rankings and increased organic traffic.

Simple, quick, and effective.


opens a new window

TECHNICAL SEO & SECURITY

SSL Certificate
This website is not SSL secured (HTTPS), the certificate issued by Amazon has expired on January 10, 2021.
Title Tag
Online Gantt Chart Software | Integrated with Asana | Free Trial
Length: 64 (recommended: 10 to 70)
Meta Description
Online Gantt Chart Software to make Project Timelines and Gantt Charts. Manage your schedules, and timelines like a Pro with the best Gantt chart maker. Simple, powerful, and intuitive online smart sheets and project management software. Plan, manage and visualize your team's projects in minutes. Free Trial.
Length: 309 (recommended: 50 to 160)
Google preview
Desktop Version

Online Gantt Chart Software | Integrated with Asana | Free Trial

https://instagantt.com

Online Gantt Chart Software to make Project Timelines and Gantt Charts. Manage your schedules, and timelines like a Pro with the best Gantt chart maker. Simple, powe...

Mobile Version

https://instagantt.com

Online Gantt Chart Software | Integrated with Asana | Free Trial

Online Gantt Chart Software to make Project Timelines and Gantt Charts. Manage your schedules, and timelines like a Pro with the b...

Encoding
Great, language/character encoding is specified: utf-8
URL Resolve

Great, a redirect is in place to redirect traffic from your non-preferred domain. All versions of your page point to the same URL.

URL Parameters
Great, the domain URLs look clean.
Attribute Value
viewport width=device-width, initial-scale=1

SEMANTIC ANALYSIS

The results of our semantic analysis are shown below using the website's language.

They are the main concepts covered by instagantt.com.

Each concept has a confidence score. The higher it is, the more important the topic is relative to the page.

Topics
Gantt chart Confidence: 93% Arrow up

A Gantt chart is a type of bar chart, devised by Henry Gantt in the 1910s, that illustrates a project schedule.

Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project.

Terminal elements and summary elements comprise the work breakdown structure of the project.

Modern Gantt charts also show the dependency (i.e., precedence network) relationships between activities.

Gantt charts can be used to show current schedule status using percent-complete shadings and a vertical "TODAY" line as shown here.

Asana (software) Confidence: 87% Arrow up

Asana is a web and mobile application designed to help teams track their work.

It was founded in 2008 by Facebook co-founder Dustin Moskovitz and ex-engineer Justin Rosenstein, who both worked on improving the productivity of employees at Facebook.

Project management software Confidence: 82% Arrow up

Project management software has the capacity to help plan, organize, and manage resource tools and develop resource estimates.

Depending on the sophistication of the software, it can manage estimation and planning, scheduling, cost control and budget management, resource allocation, collaboration software, communication, decision-making, quality management and documentation or administration systems.

Today, numerous PC & browser based project management software and contract management software solutions exist, and are finding applications in almost every type of business.

Project management Confidence: 74% Arrow up

Project management is the discipline of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria.

A project is a temporary endeavor designed to produce a unique product, service or result with a defined beginning and end (usually time-constrained, and often constrained by funding or deliverables) undertaken to meet unique goals and objectives, typically to bring about beneficial change or added value.

The temporary nature of projects stands in contrast with business as usual (or operations), which are repetitive, permanent, or semi-permanent functional activities to produce products or services.

In practice, the management of these two systems is often quite different, and as such requires the development of distinct technical skills and management strategies.

Software Confidence: 73% Arrow up

Computer software, or simply software, is that part of a computer system that consists of data or computer instructions, in contrast to the physical hardware from which the system is built.

In computer science and software engineering, computer software is all information processed by computer systems, programs and data.

Computer software includes computer programs, libraries and related non-executable data, such as online documentation or digital media.

Computer hardware and software require each other and neither can be realistically used on its own.

WEBSITE SPEED

instagantt.com website speed is fast. Page speed is important for visitors and search engines.

Get insights to improve your page loading time.

Page Loading Time

3.1s

This domain loads at the median speed of 3.1 seconds.

Speed Percentile

22%

instagantt.com is faster than approximately 22 percent of the web. Your website page speed needs to be as fast as you can make it, without compromising the customer experience.

A good goal to achieve is a loading time of 2 seconds on desktop and mobile devices.

PAGESPEED INSIGHTS

Page on which speed is tested live:

Chrome User Experience Report Results

Lighthouse Results

TRAFFIC

This website is ranked #85.643 by Alexa.

This rank is traffic based. The lower the rank is, the better the domain is ranked.

Daily visitors by country

  • instagantt.com daily visitors distribution - Total: 5 countries
  • Flag for IndiaIndia (10.0%)
  • Flag for TaiwanTaiwan (10.8%)
  • Flag for United States of AmericaUnited States of America (26.5%)
  • Flaf icon for other countryOthers (52.7%)

Traffic country ranks

Country Rank
Flag for Viet NamViet Nam #33.719
Flag for IndiaIndia #58.179
Flag for IndonesiaIndonesia #55.184
Flag for TaiwanTaiwan #9.107
Flag for United States of AmericaUnited States of America #55.886

LAYOUT

Doctype HTML5 Arrow Responsive website, mobile-friendly. Arrow

Mobile Rendering

This website seems to be optimized for Mobile Visitors.

Phone
How instagantt.com looks like on a mobile device such as an iPhone.

Tablet
How instagantt.com looks like on a tablet such as an iPad.

Main colors used

These are the main HTML color codes used by this website. Arrow
  • 53% #ffffff
  • 14% #fff0f0
  • 10% #f0f0f0
  • 3% #9060c0
  • 2% #f0ffff
  • 2% #8060d0
  • 1% #4090f0
  • 1% #202080
  • 1% #fff0ff
  • 1% #a060b0
  • 1% #b060a0
  • 1% #e0f0ff

Text/code ratio

instagantt.com's text/code ratio is 14.71%. It's a bit low. Consider raising it by adding more text content of value for your visitors, or keeping your code clean.
Text / Code Ratio 14.71%

A good text to HTML ratio is anywhere from 25 to 70%.

This percentage refers to the visible text ratio, as opposed to HTML elements, image tags and other non-visible information.

Main HTML tags

Headings Arrow up

Great, we found headings on this page.

  • <H1> 1
  • <H2> 8
  • <H3> 12
  • <H4> 0
  • <H5> 0
  • <H6> 0
<H1>
Top level heading
Online gantt chart software for asana
<H2>
2nd level heading
Manage your project plans like a pro. schedules, tasks, timelines, and workload for your team with the best gantt chart software
ınstagantt syncs your gantt charts in two way with asana
Simple, powerful, and intuitive website gantt chart.
Dependencies made easy
Workload management
<H3>
3rd level heading
Drag & drop
Powerful scheduling
Tasks & subtasks
Track progress
Workload management
Alt attributes Arrow up

We found 36 images on this website.
14 ALT attributes are missing on your image tags. The issue affects 10 actual different images that could be loaded more than once in your page.

Alternative text allows you to add a description to an image.

Google rely on alternative text attributes to determine relevance to a search query. Alternative text also makes an image more likely to appear in a Google image search.

It looks like you're missing alternative text for 14 images on instagantt.com. Check your website to make sure it's specified for each image on the page.

SOCIAL MEDIA PRESENCE

This is an overview of your homepage shares on social networks.

You're doing quiet good on social media!

Social shares are a key signal, among many others, that search engines use to evaluate the rankings of a website. Asking people to share your pages, adding visible social share buttons and make great quality content are 3 of the most powerful ways to grow your social presence.

  • Facebook iconFacebook
  • Total Engagement 266
  • Likes 67
  • Shares 64
  • Comments 135

DOMAIN REGISTRAR

Domain Registrar NAMECHEAP, INC.
Registration Date 04/28/2013 12 years, 9 months, 11 days ago
Last Modified 04/29/2019 6 years, 9 months, 11 days ago
Expiration Date 04/28/2020 Expired
Nameservers Arrow up
Host IP Address Country
ns-1441.awsdns-52.org 205.251.197.161 Flag for United StatesUnited States
ns-1631.awsdns-11.co.uk 205.251.198.95 Flag for United StatesUnited States
ns-333.awsdns-41.com 205.251.193.77 Flag for United StatesUnited States

SERVER DETAILS

Server map
  • Service Provider (ISP)
  • Amazon.com, Inc.
  • IP Address
  • 52.3.170.203
  • Country
  • Flag for United StatesUnited States
  • Region
  • Virginia , Ashburn
  • Latitude and Longitude
  • 39.0438 : -77.4874
SHARE THIS PAGE